|
KHE is dedicated to producing equipments which are
compliance with the applicable condes and standards and with customer's
specifications. The personnel in KHE with the responsibility for assuring
quality have technical knowledge to perform their function and the
organizational freedom to do their job without the pressures of production. |
||
|
Management Commitment |
||
|
The CEO shall provide evidence of the commitment to implement Quality Management System a. Communicating to the KHE organization the importance of meeting customer's |
||
| Quality Policy of KHE | ||
| "For effective use of energy, do our best to poduce high quality product" | ||
|
QA/QC Standards Systems |
||
|
KHE has established and been applied the ISO 9001:2000 Quality Management System Standards for Design, Manufacture Installation and Servicing of pressure vessels, heat exchanger, louvers and welded steel structures from August, 2001 and it was also proved by audits in accordance with the requirements of KSA
KHE's quality system was also proved by the audit in accordance with the requirement of SQL system by center of boiler and pressure vessel inspection & research(CBPVI), China in August, 1999. Our QC/Fabrication skills are inherited from Mitsubishi Heavy Industries, Mihara Japan |
||
|
|
||
|
Quality Control Procedure |
||
|
Before any welding takes place, all weld bevels shall be examined using liquid penetrate for edge defers and laminations, and shall be visually inspected internally and externally for necks, dents, general damege, or other surface defects. Pressure test shall be performed at condition specified on the approved fabrication drawings. All air coolers shall be hydrostatically tested. |
||
|
|
|
|
|
|
|
|
Pre-heatingTemperature Check |
|
|
|
|
|
|
|
|
||
|
QA/QC Polocy Statement by the president of KHE |
||
|
KHE has established the quality control system to maintain and improve quality, and also to supply safe and reliable products to customers in compliance with the Code standards. This manual is a description of the quality control system. Some portions of this manual is a applied to a quality control system. Some portions of this manual can also be applied to a project with does not require the Code stamping whenever the customers specifically notify us. No person in this organization will deviate from these quality standards set forth herein. QC Manager has sufficient and well defined responsibility, authority and organizational freedom to identify quality control problems and to initiate, recommend and provide solutions. QC Manager stops works if further processing may result non-conformance with the applicable code and customer's specification. In the event that any problems or differences in opinions cannot be resolved within the organization, they shall be brought to my attention for the final resolution. The resolution shall be within the limits of the Code and this manual" Signed by the president of KHE |
||
|
Index of QC Manual |
||
|
|
||
|
Index of QC Procedure |
||
|
|
||
|
|
||
|
|
||
|
[Home][about KHE][Product][Facilities][Engineering][Quality][Experience][Contacts][Agent]
Copyright(c) 2007 Korea Heat Exchanger Ind. Co., Ltd. All rights reserved. khe01@khei.com |
||